• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller

A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power ... Read More

Capacity :
Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap
Plant and Machinery cost:
1225.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
1674.00 Lakhs
Cost of Project :
1674.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Bicycle Tubes
Bicycle Tubes

Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyre... Read More

Capacity :
Bicycle Tubes: 10,000 Nos. /Day
Plant and Machinery cost:
118.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
622.00 Lakhs
Cost of Project :
622.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their useful life. While there is no generally accepted definition o... Read More

Capacity :
2164500 kgs. /annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.91%
Break Even Point (BEP):
49.81 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with PET Bottles
Packaged Drinking Water with PET Bottles
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b... Read More
Capacity :
Plant and Machinery cost:
131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
58.00 %
TCI :
350.00 Lakhs
Cost of Project :
350.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and us... Read More

Capacity :
210 Lakhs Nos. /annum
Plant and Machinery cost:
719.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
56.00 %
TCI :
1736.00 Lakhs
Cost of Project :
1736.00Lakhs
Add To Inquiry Basket
E Waste Recycling Plant
E Waste Recycling Plant

E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, a... Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
60.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
15.00%
Break Even Point (BEP):
43.00 %
TCI :
241.00 Lakhs
Cost of Project :
241.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
E-WASTE RECYCLING PLANT
E-WASTE RECYCLING PLANT

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity :
-
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
Growing Prospects for Packaged Drinking Water Industry
Growing Prospects for Packaged Drinking Water Industry

Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a... Read More

Capacity :
30,000 Thousand Nos./Annum or 1,00,000 Bottles /day
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
63.00 %
TCI :
282.00 Lakhs
Cost of Project :
282.00Lakhs
Add To Inquiry Basket
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask

Disposable needle is widely used by ... Read More

Capacity :
0
Plant and Machinery cost:
147.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
47.00 %
TCI :
426.00 Lakhs
Cost of Project :
426.00Lakhs
Add To Inquiry Basket
Bicycle and Cycle Rickshaw Manufacturing
Bicycle and Cycle Rickshaw Manufacturing

A Bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the ot... Read More

Capacity :
Bicycles (Different Sizes) : 1000 Nos. /Day Cycle Rickshaw : 1000 Nos. Day
Plant and Machinery cost:
336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
1525.00Lakhs
Add To Inquiry Basket
Medical Disposables (Gowns,Drapes)
Medical Disposables (Gowns,Drapes)

Medical Disposables (Gowns/Drapes)

Surgical gowns are worn by doctors and nurses ... Read More

Capacity :
Surgeon Gowns : 250 Pcs./Day Pateint Gowns : 250 Pcs./Day Bed Sheets : 300 Pcs./Day Pillow Co
Plant and Machinery cost:
204.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
492.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity :
Monitors : 5 Kgs /Day Plastic Granules : 2333.33 Kgs /Day Copper Wire Scraps : 13.33 Kgs /Day Gl
Plant and Machinery cost:
100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
325.00Lakhs
Add To Inquiry Basket
Micronutrients Fertilizer
Micronutrients Fertilizer

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of th... Read More

Capacity :
Micronutrient Fertilizer for Fruits : 187,500 Kgs/annum Micronutrient Fertilizer for Vegetabl
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
114.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be us... Read More

Capacity :
Solar Panel 5MW/Annum
Plant and Machinery cost:
109.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
62.00 %
TCI :
450.00 Lakhs
Cost of Project :
450.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity :
2164500 Kgs /Annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
526.00 Lakhs
Cost of Project :
526.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Liquid oxygen must be handled with all the precaution required for safety with any cryogenic fluid. Gaseous Oxygen is authorized for shipment in cy... Read More

Capacity :
4152 cum/Day
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
58.00 %
TCI :
286.00 Lakhs
Cost of Project :
286.00Lakhs
Add To Inquiry Basket
E–WASTE RECYCLING PLANT
E–WASTE RECYCLING PLANT

E-waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers,... Read More

Capacity :
2164500 kgs. /annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
49.00 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
Disposable Plastic Cups, Plates & Glasses
Disposable Plastic Cups, Plates & Glasses

The plastic industry in India plays a very important and key role in Industrializations. A wide spectrum of plastics and articles manufactured by t... Read More

Capacity :
1354 Lakh Pcs./annum
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.87%
Break Even Point (BEP):
45.83 %
TCI :
216.00 Lakhs
Cost of Project :
216.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER WITH PET BOTTLES
PACKAGED DRINKING WATER WITH PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
60000000 Nos. Bottles/Annum
Plant and Machinery cost:
217.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
60.00 %
TCI :
456.00 Lakhs
Cost of Project :
456.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES

Bottled water industry, colloquially called, the mineral water industry, is a symbol of new life style emerging in India. While a large segment of... Read More

Capacity :
0
Plant and Machinery cost:
403.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
60.00 %
TCI :
695.00 Lakhs
Cost of Project :
695.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
Drinking Water – 17280000 Nos. Bottles (1 Ltr.)/Annum,Soda Water – 1008000 Nos. Bottles (600 Ml)
Plant and Machinery cost:
403.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
60.00 %
TCI :
695.00 Lakhs
Cost of Project :
695.00Lakhs
Add To Inquiry Basket
BICYCLE TUBES AND MOTORCYCLE TUBES
BICYCLE TUBES AND MOTORCYCLE TUBES

Bicycle and motorcycle tubes are the backbone of the bicycle and motorcycle industries. Few numbers of companies in the organized sectors are engag... Read More

Capacity :
300000 Nos. Bicycle Tubes, 300000 Nos. Motorcycle Tubes
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
50.00 %
TCI :
240.00 Lakhs
Cost of Project :
240.00Lakhs
Add To Inquiry Basket
MATCHBOX
MATCHBOX

Matchbox is one of the most important items. Though it is looked upon as small and insignificant, earlier it was a big problem. In the 17th century... Read More

Capacity :
50000 Nos. /Day
Plant and Machinery cost:
5.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
52.00 %
TCI :
29.00 Lakhs
Cost of Project :
29.00Lakhs
Add To Inquiry Basket
Detergent cake, Powder and Dish washing Detergent cake and Powder
Detergent cake, Powder and Dish washing Detergent cake and Powder

Soaps are the earliest form of detergents. Though at present the term detergent is used for synthetic detergent derived from petroleum products. Th... Read More

Capacity :
Detergent Cake, Powder, Dish washing Cake & Powder Each 1 MT/Day = 4 MT/Day
Plant and Machinery cost:
28.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
37.00 %
TCI :
239.00 Lakhs
Cost of Project :
239.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with Pet Glasses (250 ml) (Automatic Plant)
Packaged Drinking Water with Pet Glasses (250 ml) (Automatic Plant)

Almost a decade ago, the introduction of bottled water or packaged water has changed the traditional of serving and consuming drinking water. Accor... Read More

Capacity :
128000 Packs/Day
Plant and Machinery cost:
219.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
20.00%
Break Even Point (BEP):
59.00 %
TCI :
323.00 Lakhs
Cost of Project :
323.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with Pet Bottles (1 ltr) (Automatic Plant)
Packaged Drinking Water with Pet Bottles (1 ltr) (Automatic Plant)

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
32,000 Ltrs/Day
Plant and Machinery cost:
221.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
19.00%
Break Even Point (BEP):
60.00 %
TCI :
327.00 Lakhs
Cost of Project :
327.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Bisleri, which pioneered the packaged drinking water business in India, catering to consumers need to have hygienic drinking water while on the mov... Read More

Capacity :
30,000 Thousand Nos./Annum or 1,00,000 Bottles /day
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
63.00 %
TCI :
282.00 Lakhs
Cost of Project :
282.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Water quality and quantity are interdependent, interacting elements of water system. The term water quality refers to the level of suitability of w... Read More

Capacity :
10000 Ltrs./day
Plant and Machinery cost:
60.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
40.00 %
TCI :
180.00 Lakhs
Cost of Project :
180.00Lakhs
Add To Inquiry Basket
Disposable Plastic Cups, Plates and Glasses
Disposable Plastic Cups, Plates and Glasses

The plastic in India plays a very important key role in industrialization. A wide spectrum of plastics and its articles have touched the life of ev... Read More

Capacity :
50,000 Plastics Glass, 25,000 Plastics Cups
Plant and Machinery cost:
25.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
39.00%
Break Even Point (BEP):
51.00 %
TCI :
69.00 Lakhs
Cost of Project :
69.00Lakhs
Add To Inquiry Basket
Paper Napkins, Facial Paper & Toilet Rolls From Tissue Paper Rolls
Paper Napkins, Facial Paper & Toilet Rolls From Tissue Paper Rolls

Due to Govt. emphasis for popularizing tourism, number of new hotels, holiday resorts, restaurants etc. have demand of paper conversion products li... Read More

Capacity :
2 Mt Toilet Rolls, 2 Mt Facial Paper, 6 Mt Paper Napkin (Per Day)
Plant and Machinery cost:
41.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
69.00%
Break Even Point (BEP):
23.00 %
TCI :
600.00 Lakhs
Cost of Project :
600.00Lakhs
Add To Inquiry Basket
Detergent Cake & Washing Powder
Detergent Cake & Washing Powder

Detergent are complete washing or cleaning products. The synthetic detergent industry is one of the largest chemical process industries. Some impor... Read More

Capacity :
600 Kgs/ Day
Plant and Machinery cost:
3.00 Lakhs
Working Capital :
12.00
Rate of Return (ROR):
35.06%
Break Even Point (BEP):
55.03 %
TCI :
28.00 Lakhs
Cost of Project :
28.00Lakhs
Add To Inquiry Basket
Setup Unit Of Tea Blending and Packaging (Tea, Green Tea & Herbal Tea)
Setup Unit Of Tea Blending and Packaging (Tea, Green Tea & Herbal Tea)

In order to make a distinctive and delectable blend, different teas, including ... Read More

Capacity :
-
Plant and Machinery cost:
41.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
242.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Blood Bags
Start Manufacturing Business Of Blood Bags

Blood bags are containers designed to store and transport blood and other related pro... Read More

Capacity :
Blood Bags 10,000 Nos per day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
1092.00Lakhs
Add To Inquiry Basket
Start Production of Decorative Laminated Sheet (Sunmica)
Start Production of Decorative Laminated Sheet (Sunmica)

Decorative laminated sheet is a versatile material used in the manufacturing of various produ... Read More

Capacity :
Decorative Laminated Sheet (Sunmica) 5,000,000 Sq.Mt. Per Annum
Plant and Machinery cost:
1130.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
63.00%
Break Even Point (BEP):
34.00 %
TCI :
0.00 Lakhs
Cost of Project :
2257.00Lakhs
Add To Inquiry Basket
Copper Tube Fittings Manufacturing Business
Copper Tube Fittings Manufacturing Business

Copper Tube Fittings (Elbows 45 Deg., 90 Deg., Long Radius Elbows, Couplings,... Read More

Capacity :
Copper Tube Fittings 600 MT Per Annum Copper Scrap 24 MT Per Annum
Plant and Machinery cost:
214.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
675.00Lakhs
Add To Inquiry Basket
Setup Pharmaceutical Tablets Unit (API Metformin, Amoxicillin, Ibuprofen, Paracetamol) Manufacturing Plant
Setup Pharmaceutical Tablets Unit (API Metformin, Amoxicillin, Ibuprofen, Paracetamol) Manufacturing Plant

Pharmaceutical tablets are one of the most commonly used dosage forms in medicine. Th... Read More

Capacity :
-
Plant and Machinery cost:
163.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
786.00Lakhs
Add To Inquiry Basket
Start Industry with Serum, Cream and Shampoo
Start Industry with Serum, Cream and Shampoo

Why The Beauty Industry Is... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan For Bottling of Refined Oil •	Refined Sunflower Oil • Refined Corn Oil • RBD Palm Olein Oil • Extra Virgin Olive Oil
A Business Plan For Bottling of Refined Oil • Refined Sunflower Oil • Refined Corn Oil • RBD Palm Olein Oil • Extra Virgin Olive Oil

Bottling of refined oil refers to the process of packaging high-quality, processed oi... Read More

Capacity :
-
Plant and Machinery cost:
402.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1975.00Lakhs
Add To Inquiry Basket
Start Production Of Graphite From Graphite Deposits
Start Production Of Graphite From Graphite Deposits

Graphite is a mineral that ... Read More

Capacity :
Graphite Powder 10 MT Per Day
Plant and Machinery cost:
513.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1998.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Cement Paper Bags with Printing Unit
Start Manufacturing Business Of Cement Paper Bags with Printing Unit

 

Cement Paper Bags with Printing are a popular ... Read More

Capacity :
Cement Paper Bag 50 Kgs Size 1,250 Th.Nos. Per Day Cement Paper Bag 25 Kgs Size 1,250 Th.Nos. Per
Plant and Machinery cost:
3600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
22800.00Lakhs
Add To Inquiry Basket
Setup Plant of  Biodegradable Corn Starch Granules, Bags, Plates & Cups
Setup Plant of Biodegradable Corn Starch Granules, Bags, Plates & Cups

Biodegradable corn starch products are a new innovation that ... Read More

Capacity :
-
Plant and Machinery cost:
440.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1427.00Lakhs
Add To Inquiry Basket
Setup Unit Of Aluminium Extrusion Plant
Setup Unit Of Aluminium Extrusion Plant

 

Aluminium extrusi... Read More

Capacity :
Aluminium Extruded Products 10 MT per day
Plant and Machinery cost:
234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
901.00Lakhs
Add To Inquiry Basket
Unlocking the Secrets: How to Set Up a Galena Lead Plant Successfully
Unlocking the Secrets: How to Set Up a Galena Lead Plant Successfully

Lead from galena refers to the ex... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Plant of Analytical Testing Lab (Food, Water, Soil and Pharma)
Setup Plant of Analytical Testing Lab (Food, Water, Soil and Pharma)

Analytical testing labs are facilities that specialize in tes... Read More

Capacity :
-
Plant and Machinery cost:
410.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
646.00Lakhs
Add To Inquiry Basket
Invest In Kraft Paper From Pulp  Industry
Invest In Kraft Paper From Pulp Industry

 

Kraft paper, also... Read More

Capacity :
Kraft Paper 20 MT Per Day
Plant and Machinery cost:
2002.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
4040.00Lakhs
Add To Inquiry Basket
Start Carton Boxes Manufacturing Business
Start Carton Boxes Manufacturing Business

Carton boxes, also known as corrugated boxes, are commonly used in packaging and ship... Read More

Capacity :
Carton Boxes 40 MT Per Day
Plant and Machinery cost:
409.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
2071.00Lakhs
Add To Inquiry Basket
Start Your Own Essential Oil and Oleoresins From Chili, Pepper, Ginger and Turmeric Plant
Start Your Own Essential Oil and Oleoresins From Chili, Pepper, Ginger and Turmeric Plant

 

Essential oils and oleoresins are concentrated... Read More

Capacity :
-
Plant and Machinery cost:
934.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1479.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Solar PV Glass
Start Manufacturing Business Of Solar PV Glass

Solar PV Glass, also known as photovoltaic gl... Read More

Capacity :
Solar PV (Photovoltaic) Glass 300 MT per Day
Plant and Machinery cost:
2800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
4150.00Lakhs
Add To Inquiry Basket
Setup Plant of Truck Trailer (Flatbed Trailer & Tip Trailer)
Setup Plant of Truck Trailer (Flatbed Trailer & Tip Trailer)

Are you curious about what exactly a Truck Tr... Read More

Capacity :
Cost Estimation Capacity: Flatbed Trailer 6 Nos per Day Tipper Trailer 6 Nos per Day
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
1172.00Lakhs
Add To Inquiry Basket
Liquid Caustic Soda Industry (From Caustic Flakes)
Liquid Caustic Soda Industry (From Caustic Flakes)

Liquid caustic soda, also known as sodium hydroxide, is a powerful and versatile chem... Read More

Capacity :
Liquid Caustic Soda Lye 48% 80 MT Per Day
Plant and Machinery cost:
305.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
888.00Lakhs
Add To Inquiry Basket
A Business Plan For Red Oxide Pigment
A Business Plan For Red Oxide Pigment

Red oxide pigment, also kno... Read More

Capacity :
Red Oxide Pigment 200 MT Per Day
Plant and Machinery cost:
5081.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
6945.00Lakhs
Add To Inquiry Basket
A Business Plan For Linear Alkyl Benzene
A Business Plan For Linear Alkyl Benzene

Linear Alkyl Benzene (LAB) is a versatile chemical compound that pl... Read More

Capacity :
Linear Alkyl Benzene 20 MT Per Day
Plant and Machinery cost:
340.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
832.00Lakhs
Add To Inquiry Basket
Invest In Methylaniline Business
Invest In Methylaniline Business

Methylaniline is a clear to... Read More

Capacity :
Methylaniline 40 MT Per Day
Plant and Machinery cost:
730.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
53.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
2056.00Lakhs
Add To Inquiry Basket
Invest In Alloy Wheel Business for Two Wheelers
Invest In Alloy Wheel Business for Two Wheelers

Alloy wheels for two-wheele... Read More

Capacity :
Alloy Wheel for 2 Wheeler 400 Pcs Per Day
Plant and Machinery cost:
157.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
802.00Lakhs
Add To Inquiry Basket
Setup Plant of Freon Gases for Refrigeration
Setup Plant of Freon Gases for Refrigeration

 

Freon gases, ofte... Read More

Capacity :
-
Plant and Machinery cost:
1064.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
3229.00Lakhs
Add To Inquiry Basket
Start Business of Surgical Cotton and Cotton Balls
Start Business of Surgical Cotton and Cotton Balls

 

Surgical cotton, ... Read More

Capacity :
Surgical Cotton 10,500 Kgs Per Day Cotton Balls 4,500 Kgs Per Day
Plant and Machinery cost:
1100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2600.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
Cumin, Turmeric, Chilly &... 0 0.00 0.00
Start Production Of Wire ... Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum 30.00 1736.00
Auto Brake Pad and Auto... Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum 27.00 1422.00
Business Plan for Product... Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0 28.00 1619.00
A Business Plan for Ferri... Ferric Pyrophosphate 600 MT Per Annum 31.00 133.00
How to Start A Business o... 0 0.00 0.00
A Business Plan for Seawo... Standard Seaworthy Container Size: 20Ft 2,400 Nos. Per Annum 28.00 2040.00
Setup Extraction of Salt ... Iodized Salt: 30,000 MT per annum, Industrial Salt: 30,000 MT per annum 29.00 2776.00
A business Plan For Surgi... Surgical Sutures: 450,000 Boxes per annum 27.00 877.00
Starting up production of... Glycerol Monostearate: 900 MT Per Annum 29.00 320.00
Startup A Business of Dou... 0 0.00 0.00
Now Is The Time To Take C... 0 0.00 0.00
Start Production of Potat... Potato Chips: 150,000 Kgs Per Annum Kurkure Type Snacks: 150,000 Kgs Per Annum 30.00 121.00
Setup Cashew Nut Processi... Cashew Nut Processing: 4,794 Kgs Per Day 23.00 1100.00
Start a Business of Parti... Particle Board (Size 4ftx8ftx16 inch.): 150,000 Nos. Per Annum 30.00 1100.00
A Business Plan for Wood ... Wood Plastic Composite (WPC): 10 Million Sq.Ft. per annum 27.00 790.00
Start a Production Of Sod... Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl): 200,000 MT Per Annum 14.00 1265.00
12345678910...

Showing 121 - 180 of 568 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR